# Spark Takeoff — Quick Reference Card ### Professional Electrical Estimating Software · NEC 2023 / CEC Title 24 --- ## TOP 10 FEATURES | # | Feature | What It Does | |---|---------|-------------| | 1 | **Load Calculator** | Sizes services per NEC Article 220 — demand factors, range/dryer/HVAC/motor/EV loads, auto-suggests service amperage | | 2 | **Wire Sizing** | Sizes conductors per NEC 310.16 with voltage drop (210.19), circular mils, parallel runs, 60/75/90°C columns | | 3 | **Conduit Pricing** | Compares installed cost/ft for Rigid, EMT, and PVC — field-bent vs prefab fittings — with your local market multipliers | | 4 | **Service Changeout** | Full estimate with current AFCI/GFCI requirements (NEC 210.12, 210.8), Title 24 EV-ready, SPD, grounding per 250 | | 5 | **RFI Detector** | Scans your job notes and plan photos against 15 red-flag patterns — flags missing specs before you bid | | 6 | **AI Layout Generator** | GPT-4o reads your site photo + job data and generates a print-ready SVG schematic in seconds | | 7 | **Prefab Workflow** | Break assemblies into phases with man-hours, QC checkpoints, material specs, waste tracking, and QR work orders | | 8 | **Touch Canvas** | Finger/stylus markup on plans or AI schematics — pen, arrow, text, shapes, undo/redo, export to PNG/SVG | | 9 | **Bid Proposal PDF** | One-click customer-facing proposal — summary page + detailed line items, no internal costs shown | | 10 | **Multi-Region Pricing** | 58 U.S. metros with local material, labor, permit, and trenching multipliers — switch regions anywhere you travel | --- ## KEYBOARD SHORTCUTS | Shortcut | Action | |----------|--------| | **Ctrl/Cmd + Z** | Undo (canvas markup) | | **Ctrl/Cmd + Shift + Z** | Redo (canvas markup) | | **Ctrl/Cmd + Y** | Redo (canvas markup) | | **☰ Features** | Click to open the feature drawer — all tools grouped by workflow | | **🎙️ Voice** | Click to dictate job notes (Chrome/Edge/Safari with microphone) | | **📄 Save as PDF** | Click in the proposal window to print or save as PDF | --- ## QUICK START (90 SECONDS) 1. **Set your rate** → Business drawer → Overhead / Rate → Calculate 2. **Set your location** → Project drawer → Location → pick your metro 3. **Start a job** → Project drawer → Job Setup → type or dictate the job 4. **Take photos** → Plans drawer → Plans & Photos → upload from camera 5. **Run the calcs** → Engineering drawer → Load Calc → Wire Sizing → Conduit 6. **Check for gaps** → Plans drawer → RFI Detector → Re-scan 7. **Generate the bid** → Job Setup → Generate Proposal PDF → Save as PDF --- ## CODE REFERENCES BUILT IN - NEC 2023 (NFPA 70) — Articles 210, 220, 230, 240, 250, 300, 310, 430, 450, 625, 705 - CEC Title 24 Part 6 (California Energy Code) - Mike Holt's Illustrated Guide to the NEC - Tom Henry's NEC Code Books - Soares Book on Grounding & Bonding - Stallcup's Electrical Illustrations - NECA Manual of Labor Units - Ugly's Electrical References - RSMeans Electrical Cost Data - NFPA 70E (Electrical Safety in the Workplace) --- ## SYSTEM REQUIREMENTS - Any modern browser (Chrome, Edge, Safari, Firefox) - Works on phone, tablet, laptop, desktop - Offline-capable (PWA — install to home screen) - No install, no server, no subscription required - Your data stays on your device (IndexedDB) --- *Spark Takeoff v1.0 — Built for electrical contractors by electrical contractors.* *Visit [your-website.com] or call [your phone] for licensing.*